Construction sitesPortable full-height turnstiles
Construction site access control without a guard shack or a foundation: full-height turnstiles on a portable steel base that sets down on grade, runs on line power or solar, takes your badge reader, and moves with the job. Built in Calhan, Colorado.
Fig. 01 · Key What the gate needs from your site
Construction site securityStart at the gate
Construction site security starts at the gate. Chain-link keeps the public off the job, but it can’t count. With hundreds of workers and subs rotating in every day, the only record of who walked through is a clipboard nobody trusts.
The owner asks. The honest answer is a sign-in sheet half the crew walked past.
When the site clears for an evacuation, the headcount is only as good as the list it’s checked against.
Subs rotate on and off every day. A fence can’t tell a badged electrician from whoever walked in behind them.
Once the crews leave, an open gate is how tools and material walk off, and how trespassers walk in.
One person, one badge, one turn. The count is real.
A full-height turnstile doesn’t let two people through on one badge, and it’s still standing guard after the last crew goes home. Your badge system keeps the record. The turnstile makes sure the record is true.
Request a quotePortable turnstilesNo slab, no power drop
Most construction site access control assumes a concrete pad and a power drop at the gate. Yours has neither, and it won’t stay put. So the turnstile stands on its own steel base, sets down on grade, gravel or a slab, and moves by forklift whenever the fence does.
01Phase 01 · Site prep
The fence goes up before anything else, usually before there’s a slab to bolt to or a power drop at the gate. The turnstile’s steel base sets right on grade or gravel and runs on line power or the solar option, quoted per site. Your badge readers are on the gate from the first day of the job.
02Phase 02 · Vertical construction
As the building goes up, laydown shifts, parking opens and the perimeter gets redrawn. When the gate has to follow it, a forklift picks the turnstile up by its base and sets it down on the new fence line. Nothing to jackhammer out, no new foundation to pour.
03Phase 03 · Closeout
When the fence comes down, the turnstile doesn’t go out with the dumpsters. It goes on a truck to your next project. It’s a galvanized steel base and a full-height turnstile, built in Calhan, Colorado, to be set down, picked up and set down again.
Send us the site plan and the phases you expect. We’ll show where the gate goes and quote it.
Construction site turnstilesThe lineup
Three construction site turnstiles, each a full-height turnstile on its own steel base, galvanized or powder-coated, and built in Calhan, Colorado, to last well past this job. Every unit is configured for your gate and carries our multi-year warranty on workmanship and materials.
The standard job-site gate. One full-height lane on its own steel base, which sets on grade and moves by forklift.
The same portable turnstile with an arched plexiglass canopy over the lane, for a gate out in the weather where the crew stands to badge in.
Two turnstiles in one footprint, on one base. Two lanes at the gate for shift change, and still a single forklift move.
Bought once
You pay for it once. At closeout the base goes on a truck to your next job, so a portable turnstile is site equipment that serves job after job, not a cost you tear out with the fence.
The ramp and the cold weather package have list prices. The ADA gate and solar are quoted with the turnstile, because they depend on your site.
List prices are where a gate starts. Lanes, canopy, finish, power and the readers you’re mounting move the number, so send the gate and we’ll price the turnstile, base and add-ons together.
IntegrationBadges and readers
Keep the badges your crews already carry. We build the turnstile. Your integrator’s card readers, controllers and software mount to it and run it, so construction site access control stays on the system your company already trusts.
We build
Your integrator supplies
Install Our crew can put in the turnstile and your access system together, or we ship it ready for your crew.
For security integrators
You own the readers, the controllers and the software. Send the gate and the hardware going on it, and we’ll quote a full-height turnstile on a portable base to take it, with our crew to install alongside yours if you want them.
On the jobCase file: Jacobs
Jacobs needed to control who walked onto a construction site on a 230-acre Pfizer campus in Sanford, North Carolina. We built the full-height turnstile bank in Calhan, Colorado, and our crew installed it with the site’s access control system. When a supplier’s part let it down, we came back until it ran right.
06The finished bank on Jacobs’ slab, at the edge of the work zone.
Rotors crated on arrival, Jacobs and Pfizer trailers behind.
Parts staged by the fence before the build.
Frames up, arms laid out for assembly.
No slab on your site? It’s the same full-height turnstile. Where the concrete isn’t poured yet, we build it on a steel portable base that sets on grade instead.
Years in construction
Outlaw was founded by Jesse James Moses Sr., who has more than 40 years in construction. Father and son since 2017, we build turnstiles for how a job site actually runs: crews at shift change, a fence that keeps moving, a schedule that doesn’t.
About the familyThe locking mechanisms are a supplier’s part. The turnstile is ours, so the problem was too.
Every gate has a bad day. On yours, the people who built the turnstile are the ones who come back to fix it, under a multi-year warranty on workmanship and materials.
OrderingHow an order runs
Five steps, starting with your site plan. Here is how a job-site turnstile from Outlaw goes from paper to a gate your crews badge through, so you can put it on the schedule next to everything else.
Four things and we can draw your gate. No power yet is an answer too.
The turnstile on its base at your gate, drawn to your plan, with the price to match. Buy American compliance documentation comes with every quote.
You getDrawingQuoteBuy American docs
Configured units typically take 4 to 8 weeks from approved drawing to delivery, depending on configuration, finish and quantity.
It sets down on grade, gravel or a slab. No foundation to pour.
When the fence line shifts, a forklift picks up the turnstile, base and all, and sets it at the new gate. At closeout it goes on a truck to your next job.
The build clock starts when you approve the drawing, not when you first call. To have the turnstile at the gate before your first crew shows up, approve the drawing eight weeks or more ahead. That means the site plan comes to us before then.
QuestionsAsked before the quote
What site managers and integrators ask about job-site turnstiles before they send us a site plan: power, moving the gate, badges, schedule, Buy American and price. One straight answer each.
Not on the log? Call (800) 590-0464
Construction site access control is how a project decides who gets through the gate and keeps a record of who is on site. On a large job that usually means a perimeter fence, one or two controlled entry points, and a badge reader at each one, tied to the access system your team or integrator runs. Outlaw builds the physical part: full-height turnstiles on a portable steel base that let one person through per badge and move with the job.
A fence keeps people out and a guard can check faces, but neither gives you a count you can trust of who is on site right now. With hundreds of workers and subs changing every day, a sign-in sheet falls behind by mid-morning. A full-height turnstile lets one person through per badge, so every entry lands in your access system and a group cannot walk in behind one badge. You can keep the guard. The turnstile means the guard is no longer the only record.
Yes. The portable turnstile is built on its own galvanized steel base that sets down on grade, gravel or a slab, so there is no foundation to pour at the gate. It runs on line power where you have it, and where you do not, a solar option is available, quoted per site. Tell us what is at the gate today and the drawing we send back shows how the turnstile is set and powered.
Yes, that is what the portable base is for. When the fence line shifts between phases, a forklift picks up the turnstile, base and all, and sets it at the new gate. There is no foundation to break out and nothing left behind. At closeout it goes on a truck to your next job. A 72 × 48 aluminium diamond-plate ramp ($1,315.78) leads up onto the base and is hinged to fold for transport.
Your access control system stays yours. Outlaw builds the turnstile, and your integrator supplies the card readers, controllers and software, which mount to the turnstile. On a Pfizer construction site in Sanford, North Carolina, the access system for Jacobs came from TURNSTILES.us, and our crew installed the turnstiles and that system together. If you are the integrator, we are the turnstile behind your system.
Configured units typically take 4 to 8 weeks from approved drawing to delivery, depending on configuration, finish and quantity. The clock starts when you approve the drawing, not when you first call, so send the site plan well before mobilization if you want the turnstile at the gate before your first crew arrives. Every unit is built and tested in Calhan, Colorado.
Yes. Every Outlaw turnstile is manufactured in Calhan, Colorado. The turnstiles are Buy American Act compliant, Outlaw is on the GSA Schedule, and compliance documentation is provided with every quote, so it can go straight to the owner or the contracting officer with the submittal.
Catalog list prices: the portable AG-30-T full-height turnstile starts at $13,371.67, with an arched plexiglass canopy from $17,221.67, and the portable tandem, two turnstiles on one base, from $22,866.67. The base ramp is $1,315.78 and the cold weather package is $701.75. Site-specific options such as solar power, a full-height ADA gate and the mounting for your badge readers are quoted with your drawing. These are steel turnstiles you own, built to move from job to job, with a multi-year warranty on workmanship and materials. They are not rental units.
Next stepBefore the first crew shows up
Your gate has to work on day one, and configured units typically take 4 to 8 weeks from approved drawing to delivery. The quote is the part of that schedule you can start today. Send the plan now and the turnstile is on site at mobilization.
Send with it