Construction sitesPortable full-height turnstiles

Construction site access control that moves with the job

Construction site access control without a guard shack or a foundation: full-height turnstiles on a portable steel base that sets down on grade, runs on line power or solar, takes your badge reader, and moves with the job. Built in Calhan, Colorado.

  • Made in U.S.A.
  • GSA Schedule
  • Buy American compliant
A galvanized full-height turnstile with a solar roof on a diamond-plate steel base on gravel, set into a temporary chain-link fence line at a construction site at sunrise, fence panels on sandbag feet butting into both sides so the turnstile is the only way through, with a tower crane and a steel frame behind.
Fig. 01Portable full-height turnstile BaseSteel · sets on grade SceneIllustrative

Fig. 01 · Key What the gate needs from your site

  • No slab, no pour The steel base sets down on grade or gravel. Nothing to form, nothing to cure.
  • Line power or solar Run it off site power, or take the solar option, quoted per site.
  • Your badge reader Your integrator’s readers mount to the turnstile and tie into your system.
  • Moves with the job When the fence line moves, a forklift picks up the base and sets it at the new gate.

Construction site securityStart at the gate

A fence keeps people out. It doesn’t tell you who’s in.

Construction site security starts at the gate. Chain-link keeps the public off the job, but it can’t count. With hundreds of workers and subs rotating in every day, the only record of who walked through is a clipboard nobody trusts.

  1. Who’s on site right now?

    The owner asks. The honest answer is a sign-in sheet half the crew walked past.

  2. Is everyone out?

    When the site clears for an evacuation, the headcount is only as good as the list it’s checked against.

  3. Whose crew is that?

    Subs rotate on and off every day. A fence can’t tell a badged electrician from whoever walked in behind them.

  4. Who’s here after hours?

    Once the crews leave, an open gate is how tools and material walk off, and how trespassers walk in.

Figure 2, illustrative plan view. The same crew walks through two gates. Through an open gate, people bunch through together, only some sign the sheet, and the number on site is unknown. Through a full-height turnstile, they pass one at a time on their own badge, and the count is exact.

One person, one badge, one turn. The count is real.

A full-height turnstile doesn’t let two people through on one badge, and it’s still standing guard after the last crew goes home. Your badge system keeps the record. The turnstile makes sure the record is true.

Request a quote

Portable turnstilesNo slab, no power drop

Built for a perimeter that changes every phase

Most construction site access control assumes a concrete pad and a power drop at the gate. Yours has neither, and it won’t stay put. So the turnstile stands on its own steel base, sets down on grade, gravel or a slab, and moves by forklift whenever the fence does.

Figure 3, an illustrative site plan with three phases. In site prep, the fence runs around the whole lot and the turnstile sits on its steel base on grade at the south fence. In vertical construction, the building goes up, the west lot opens for worker parking, the fence moves in, and a forklift moves the turnstile to the new west fence line. At closeout the fence comes down and the turnstile is loaded on a flatbed truck for the next job.
  1. Fence around the whole lot. The turnstile sits on grade at the gate.

    01Phase 01 · Site prep

    No slab, no power at the gate? Set it on grade.

    The fence goes up before anything else, usually before there’s a slab to bolt to or a power drop at the gate. The turnstile’s steel base sets right on grade or gravel and runs on line power or the solar option, quoted per site. Your badge readers are on the gate from the first day of the job.

    • Sets on grade, gravel or a slab
    • Line power or solar
  2. The fence moved in. A forklift moved the turnstile with it.

    02Phase 02 · Vertical construction

    The fence moves. A forklift moves the gate.

    As the building goes up, laydown shifts, parking opens and the perimeter gets redrawn. When the gate has to follow it, a forklift picks the turnstile up by its base and sets it down on the new fence line. Nothing to jackhammer out, no new foundation to pour.

    • Moved by forklift
    • No foundation
  3. The fence comes down. The turnstile goes on a truck to the next job.

    03Phase 03 · Closeout

    At closeout, it goes to your next job.

    When the fence comes down, the turnstile doesn’t go out with the dumpsters. It goes on a truck to your next project. It’s a galvanized steel base and a full-height turnstile, built in Calhan, Colorado, to be set down, picked up and set down again.

    • Loads on a flatbed
    • Built in Calhan, Colo.
Sets on
Grade, gravel or a slab
Moves by
Forklift
Power
Line, or solar quoted per site

Send us the site plan and the phases you expect. We’ll show where the gate goes and quote it.

Construction site turnstilesThe lineup

Job-site turnstiles we build

Three construction site turnstiles, each a full-height turnstile on its own steel base, galvanized or powder-coated, and built in Calhan, Colorado, to last well past this job. Every unit is configured for your gate and carries our multi-year warranty on workmanship and materials.

  1. Render of the Portable AG-30-T: a full-height turnstile standing on a square diamond-plate steel base.
    1. Full-height turnstile
    2. 72 × 72 portable base

    Portable AG-30-T

    The standard job-site gate. One full-height lane on its own steel base, which sets on grade and moves by forklift.

    Lanes
    1
    Base
    72 × 72 steel
    Finish
    Galvanized or powder coat
    Price
    From $13,371.67
    Portable AG-30-T details
  2. Render of the Portable AG-30-T with an arched plexiglass canopy over the turnstile, on a diamond-plate steel base.
    1. Arched plexiglass canopy
    2. Full-height turnstile
    3. Portable steel base

    Portable AG-30-T with canopy

    The same portable turnstile with an arched plexiglass canopy over the lane, for a gate out in the weather where the crew stands to badge in.

    Lanes
    1
    Base
    72 × 72 steel
    Finish
    Galvanized or powder coat
    Price
    From $17,221.67
    Portable AG-30-T with canopy details
  3. Render of the Portable tandem turnstile: two full-height turnstiles side by side under one top, on a rectangular steel base.
    1. Lane one
    2. Lane two
    3. 72 × 108 portable base

    Portable tandem

    Two turnstiles in one footprint, on one base. Two lanes at the gate for shift change, and still a single forklift move.

    Lanes
    2
    Base
    72 × 108 steel
    Finish
    Galvanized or powder coat
    Price
    From $22,866.67
    Portable tandem details

Bought once

You pay for it once. At closeout the base goes on a truck to your next job, so a portable turnstile is site equipment that serves job after job, not a cost you tear out with the fence.

List prices are where a gate starts. Lanes, canopy, finish, power and the readers you’re mounting move the number, so send the gate and we’ll price the turnstile, base and add-ons together.

IntegrationBadges and readers

Works with your badge system

Keep the badges your crews already carry. We build the turnstile. Your integrator’s card readers, controllers and software mount to it and run it, so construction site access control stays on the system your company already trusts.

Fig. 05 Reader to rotor Elevation · not to scale
Drawing of a full-height turnstile on its steel base. A card reader is mounted on the entry-side post. Dashed wires run from the reader to a door controller beside the gate, from the controller to the locking mechanism in the turnstile head, and from the controller under grade to the access software. A B C D E
  1. Badge at the reader A worker badges in at your reader.
  2. Your system decides Your controller checks the badge against your software.
  3. One turn, one person The lock releases and the rotor turns once.

Who supplies what

We build

  • Locking mechanismIn the turnstile head. Your controller tells it when to release.
  • Full-height turnstile and steel baseBuilt in Calhan, Colorado. Sets on grade and moves with the job.

Your integrator supplies

  • Card readersMount to the turnstile at the entry side, where the crew badges in.
  • Door controllersWired to the reader and the lock. They make the call.
  • Access software and credentialsThe system you already run, with the badges your crews already carry.

Install Our crew can put in the turnstile and your access system together, or we ship it ready for your crew.

On the Jacobs site, it went like this

Access systemTURNSTILES.us
EntraPass software, Kantech door controllers, card readers and video intercoms.
TurnstilesOutlaw Industries
The full-height turnstile bank, built in Calhan, Colorado.
InstallationOur crew
Put in the turnstiles and the access system together.

For security integrators

We’re the turnstile behind your system.

You own the readers, the controllers and the software. Send the gate and the hardware going on it, and we’ll quote a full-height turnstile on a portable base to take it, with our crew to install alongside yours if you want them.

On the jobCase file: Jacobs

Securing a Pfizer construction site for Jacobs

Jacobs needed to control who walked onto a construction site on a 230-acre Pfizer campus in Sanford, North Carolina. We built the full-height turnstile bank in Calhan, Colorado, and our crew installed it with the site’s access control system. When a supplier’s part let it down, we came back until it ran right.

Fig. 06 Field photos Sanford, N.C. · 4 frames
Galvanized full-height turnstile bank installed on a concrete slab at the Jacobs site, orange safety fencing and a building under construction behind it.

06The finished bank on Jacobs’ slab, at the edge of the work zone.

  1. Turnstile rotors packed in a wooden crate on site, with the Jacobs and Pfizer site trailers behind.

    Rotors crated on arrival, Jacobs and Pfizer trailers behind.

  2. Crated turnstile parts and steel panels staged beside the site fence near the trailers.

    Parts staged by the fence before the build.

  3. Turnstile frames standing on the lot with rotor arms laid out on the ground for assembly.

    Frames up, arms laid out for assembly.

The job

Contractor
JacobsWorldwide engineering and construction company
Site
230-acre Pfizer campusSanford, North Carolina, south of the Research Triangle
We built
A full-height turnstile bankMade in our shop in Calhan, Colorado
We installed
Turnstiles and access controlPut in together by our crew
Jacobs had ready
A slab and electriciansTheir concrete slab was already poured, so the bank was set on it

No slab on your site? It’s the same full-height turnstile. Where the concrete isn’t poured yet, we build it on a steel portable base that sets on grade instead.

Years in construction

Outlaw was founded by Jesse James Moses Sr., who has more than 40 years in construction. Father and son since 2017, we build turnstiles for how a job site actually runs: crews at shift change, a fence that keeps moving, a schedule that doesn’t.

About the family

When the locks failed, we came back. Twice.

The locking mechanisms are a supplier’s part. The turnstile is ours, so the problem was too.

Service logJacobs · Sanford, N.C. Under warranty
  1. 01 Installed The bank goes in on Jacobs’ slab, wired to the site’s access control.
  2. 02 Locks fail The locking mechanisms develop a defect from the company that makes them.
  3. 03 Back on site Our crew returns under warranty and works the locks.
  4. 04 Back again A second warranty trip, until the locks ran right.
  5. Status Running

Every gate has a bad day. On yours, the people who built the turnstile are the ones who come back to fix it, under a multi-year warranty on workmanship and materials.

Full case study Read how the Jacobs gate came together

OrderingHow an order runs

From site plan to a working gate

Five steps, starting with your site plan. Here is how a job-site turnstile from Outlaw goes from paper to a gate your crews badge through, so you can put it on the schedule next to everything else.

  1. Step 01You

    Send the site plan

    Four things and we can draw your gate. No power yet is an answer too.

    • Site plan with the gate marked
    • Headcount at the busiest point of the job
    • Project duration start to closeout
    • Power at the gate line, solar, or none yet
  2. Step 02Us

    We send back a drawing and a quote

    The turnstile on its base at your gate, drawn to your plan, with the price to match. Buy American compliance documentation comes with every quote.

    You getDrawingQuoteBuy American docs

  3. Step 03Calhan, Colo.

    Built and tested in Calhan, Colorado

    Configured units typically take 4 to 8 weeks from approved drawing to delivery, depending on configuration, finish and quantity.

  4. Step 04Our crew or yours

    Delivered and set at your gate

    It sets down on grade, gravel or a slab. No foundation to pour.

    Our crew
    Delivers and installs it, with your access system if you want both at once.
    Your crew
    We ship it ready to set.
  5. Step 05Every phase

    When the job moves, the gate moves

    When the fence line shifts, a forklift picks up the turnstile, base and all, and sets it at the new gate. At closeout it goes on a truck to your next job.

Quote early. Count back from mobilization.

The build clock starts when you approve the drawing, not when you first call. To have the turnstile at the gate before your first crew shows up, approve the drawing eight weeks or more ahead. That means the site plan comes to us before then.

Fig. 07 Count back from day one Weeks to mobilization
  • Plan in, drawing and quote back
  • Build and test in Calhan
  • Delivery, typically 4 to 8 weeks after approval

QuestionsAsked before the quote

Construction site access control questions

What site managers and integrators ask about job-site turnstiles before they send us a site plan: power, moving the gate, badges, schedule, Buy American and price. One straight answer each.

Fig. 08 RFI log 8 of 8 answered
  1. RFI-01 The basics
  2. RFI-02 Fence and a guard
  3. RFI-03 No power, no slab
  4. RFI-04 The gate moves
  5. RFI-05 Your badge system
  6. RFI-06 Lead time
  7. RFI-07 Buy American
  8. RFI-08 Price

Not on the log? Call (800) 590-0464

RFI-01 The basics

What is construction site access control?

Construction site access control is how a project decides who gets through the gate and keeps a record of who is on site. On a large job that usually means a perimeter fence, one or two controlled entry points, and a badge reader at each one, tied to the access system your team or integrator runs. Outlaw builds the physical part: full-height turnstiles on a portable steel base that let one person through per badge and move with the job.

RFI-02 Fence and a guard

Do we need a turnstile, or is a fence and a guard enough?

A fence keeps people out and a guard can check faces, but neither gives you a count you can trust of who is on site right now. With hundreds of workers and subs changing every day, a sign-in sheet falls behind by mid-morning. A full-height turnstile lets one person through per badge, so every entry lands in your access system and a group cannot walk in behind one badge. You can keep the guard. The turnstile means the guard is no longer the only record.

RFI-03 No power, no slab

Can a turnstile go in where there is no power or concrete pad yet?

Yes. The portable turnstile is built on its own galvanized steel base that sets down on grade, gravel or a slab, so there is no foundation to pour at the gate. It runs on line power where you have it, and where you do not, a solar option is available, quoted per site. Tell us what is at the gate today and the drawing we send back shows how the turnstile is set and powered.

RFI-04 The gate moves

Can we move the turnstile when the site layout changes?

Yes, that is what the portable base is for. When the fence line shifts between phases, a forklift picks up the turnstile, base and all, and sets it at the new gate. There is no foundation to break out and nothing left behind. At closeout it goes on a truck to your next job. A 72 × 48 aluminium diamond-plate ramp ($1,315.78) leads up onto the base and is hinged to fold for transport.

RFI-05 Your badge system

Will it work with our badge or access control system?

Your access control system stays yours. Outlaw builds the turnstile, and your integrator supplies the card readers, controllers and software, which mount to the turnstile. On a Pfizer construction site in Sanford, North Carolina, the access system for Jacobs came from TURNSTILES.us, and our crew installed the turnstiles and that system together. If you are the integrator, we are the turnstile behind your system.

RFI-06 Lead time

How long does it take to get a construction site turnstile?

Configured units typically take 4 to 8 weeks from approved drawing to delivery, depending on configuration, finish and quantity. The clock starts when you approve the drawing, not when you first call, so send the site plan well before mobilization if you want the turnstile at the gate before your first crew arrives. Every unit is built and tested in Calhan, Colorado.

RFI-07 Buy American

Do your turnstiles meet Buy American rules for federal or owner-specified jobs?

Yes. Every Outlaw turnstile is manufactured in Calhan, Colorado. The turnstiles are Buy American Act compliant, Outlaw is on the GSA Schedule, and compliance documentation is provided with every quote, so it can go straight to the owner or the contracting officer with the submittal.

RFI-08 Price

How much does a construction site turnstile cost?

Catalog list prices: the portable AG-30-T full-height turnstile starts at $13,371.67, with an arched plexiglass canopy from $17,221.67, and the portable tandem, two turnstiles on one base, from $22,866.67. The base ramp is $1,315.78 and the cold weather package is $701.75. Site-specific options such as solar power, a full-height ADA gate and the mounting for your badge readers are quoted with your drawing. These are steel turnstiles you own, built to move from job to job, with a multi-year warranty on workmanship and materials. They are not rental units.

Next stepBefore the first crew shows up

Send the site plan. We'll send back a drawing.

Your gate has to work on day one, and configured units typically take 4 to 8 weeks from approved drawing to delivery. The quote is the part of that schedule you can start today. Send the plan now and the turnstile is on site at mobilization.

Send with it

  • Site plan with the gate marked
  • Headcount at the busiest point
  • Start date to closeout
  • Power at the gate, or none yet
  • Made in Calhan, Colorado
  • Buy American docs with every quote
  • GSA Schedule
  • Family-owned, father & son
Fig. 09 What comes back Your gate, drawn
  1. Your badge reader mounts here
  2. Portable steel base, sets on grade
  3. Line power, or a solar option
Project
Your job site
Gate
Where your plan marks it
Unit
Portable full-height turnstile
Built
Calhan, Colorado
Lead
4–8 weeks from approved drawing