Full-Height Turnstiles
For perimeter access at federal buildings, courthouses, and secure installations. Galvanized or stainless steel finish. Integrates with PIV, CAC, badge readers, and federal access control systems.
View full-height turnstiles →GSA Schedule approved. Buy American Act compliant. Manufactured in our Calhan, Colorado facility for federal buildings, courthouses, military installations, and government contractors nationwide.
Federal procurement has rules commercial buyers don't deal with. Buy American Act compliance, Trade Agreements Act sourcing, GSA Schedule procurement. Every product we manufacture qualifies under these requirements because every product is made in our Calhan, Colorado facility.
Federal access control typically integrates with PIV and CAC credentialing systems, biometric readers, and federal-specific access control software. Our turnstiles and gates are specified to work with whatever access control infrastructure your facility uses.
Federal buildings, courthouses, and military installations specify materials and finishes for high-traffic, high-security use. We manufacture in hot-dipped galvanized steel, stainless steel, and powder-coated finishes, with locking mechanisms tested to over one million cycles before shipping.
The configurations most commonly specified for federal facilities.
For perimeter access at federal buildings, courthouses, and secure installations. Galvanized or stainless steel finish. Integrates with PIV, CAC, badge readers, and federal access control systems.
View full-height turnstiles →For courthouse security, federal building entrances, and high-security transaction points. Specified to UL 752 ballistic ratings.
View bullet-resistant systems →ADA-compliant accessible passage paired with full-height turnstile installations. Required for all public-facing federal facilities under Section 504.
View ADA gates →For controlled federal lobby environments and lower-throughput entry points. Integrates with badge readers and biometric access control.
View tripod turnstiles →For federal office building lobbies where architectural finish and visitor flow matter. Stainless steel construction with badge and mobile credential integration.
View optical lanes →For specialized federal applications including secure rotating booths, anti-tailgating configurations, and sensitive site perimeter security. Specified to project requirements.
Request a specification →Our turnstiles, gates, and access-control hardware are installed across federal facility types nationwide.
Our turnstiles and gates are installed at federal buildings, military installations, courthouses, and government facilities nationwide. Specific past performance documentation is available upon request for procurement reference.
From initial specification to final installation, our process accommodates federal procurement timelines and documentation requirements.
Yes. We hold an active GSA Schedule contract for turnstiles, gates, and access-control hardware. Authorized federal buyers can order through GSA Advantage or contact us directly to procure through our Schedule.
Yes. All Outlaw Industries products are manufactured entirely in our Calhan, Colorado facility, satisfying Buy American Act requirements for federal procurement. Compliance documentation is provided with every federal quote.
Yes. We have completed installations at federal buildings, military installations, courthouses, and government facilities across the country. Past performance documentation is available upon request for federal procurement reference.
Yes. Our turnstiles and gates are specified to integrate with PIV, CAC, HSPD-12 compliant credentialing systems, biometric readers, and federal access control software. We work with your facility's existing or planned access control infrastructure.
Yes. We provide Buy American Act compliance statements, manufacturing documentation, quality testing records, and any other documentation required by your procurement office, included with every federal quote and delivery.
Stock units ship within a week. Configured units typically take 4 to 8 weeks from approved drawing to delivery. Installation is scheduled separately based on site readiness and any site-specific access or clearance requirements.
Whether you are ordering through GSA Schedule, working as a prime contractor, or specifying for a federal agency, we will provide drawings, specifications, and compliance documentation with your quote.